MoonWalk London 2019 is back on Clapham Common

The Moonwalk London, organised by Walk the Walk, moved to Clapham Common in 2014 and following the success that year it has been on Clapham Common ever since. Walk the Walk is a grant making charity, specialising in creating Power Walking challenges with the aim of not only raising money for vital breast cancer causes, but to also encourage women and men to become more aware of their own potential for good health and fitness through walking. The MoonWalk London has become an iconic flagship event, and this year is celebrating its 22nd year. On this one night the event can expect to raise over £6 million, which over the past 20 years has contributed to the charity raising over £130 million. Event Details: The construction of MoonWalk London begins on Friday 3 May. Saturday 4 May – Work will be taking place during normal working hours. Saturday 11 May – Sound checks may take place during the afternoon. The event will commence from 8.30pm in the evening. Sunday 12 May: The MoonWalk closes at approximately 11.00am – after which there is minimal activity for the rest of the day. The MoonWalk will leave Clapham Common on Thursday 16 May. If you have any concerns about the Event, please contact the organisers or Lambeth on the following; For direct contact with Walk the Walk: Monday – Friday 9am – 5.30pm – Please Call 01483 741 430 During the Event: From 9am Saturday 12 May to 12.00 Midday on Sunday 13th May – Please Call MoonWalk Hotline Number 0207 812 2262. If a message is left, they will respond as...

Could we have some rain please …..

The Verti -draining has been done to de compress the ground. The chain harrow has been done to lift the grass and encourage it to spring back. On Tuesday we began to lay the new turf in the first stage (pre Lambeth Country Show). Now what’s needed is a good rain shower over the next couple of days just to get that grass growing.  BBC Weather isn’t forecasting any.  So Talbots are on the job and have their water bowser on the park watering the new turf areas and then onto the dry brown patches of grass.  However, if anyone has a good rain dance then do pop down to Brockwell – our new turf would be grateful. Talbots also had a delivery of 20 tons of top soil today and they will begin to start working on areas where there were deep ruts and areas of uneven surfaces. Working is progressing well and we’ll continue to update you. Below are some pictures of the new turf going in.  It will be rolled and evened out and then the joins will knit together and the edges will be tided up....

Field Day and the Mighty Hoopla

Brockwell Park 1st-3rd June 2018 This is designed to give some further information around the events taking place in Brockwell Park this weekend and to answer some of the more frequently asked questions. This information is also available on the letter that was circulated to local residents. Throughout the event, the main park facilities remain open to the public including the Lido, Tennis Courts, BMX track, Bowling Green, Brockwell Hall & Cafe, children’s play area and biodiversity gardens.   Event dates and timings are as follows: Date                             Opening to public times           Regulated Entertainment timings Friday 1 June 2018        13:00-23:00                                           14:00 – 22:30 Saturday 2 June 2018    11:30-23:00                                           12:00 – 22.30 Sunday 3 June 2018      12:00-23:00                                           12:00 – 21:30 Build & Break of the Event The build of the event commenced on the 20th May and was a phased build to allow much of the event footprint to remain open and accessible to the public throughout the build and break. The event infrastructure was built in discreet compounds and pathways will remained open and accessible to the public for as long as possible. The break and de-rig of the event will conclude on the 10th June with a post event site check and handover with the Council scheduled for the 11th June.   Noise Control Noise control measures have been formulated to minimise noise disturbance for local residents. Field Day & the Mighty Hoopla have appointed a sound management contractor to work with the Council to ensure the agreed sound levels are adhered to, both within the site and at agreed points adjacent to residential...

Streatham Common Reinstatement Update

EventLambeth and Lambeth Landscapes met with representatives from the Friends of Streatham Common to look at the common and areas for reinstatement. The main area of damage from Circus Zyair has been levelled and a large amount of soil (50:50 mix sand and soil) has been brought onsite to re-level the area and assist with the re-seeding.  The Lambeth Landscapes team were spreading the soil yesterday and will be following with re-seeding today.  The areas that fall outside of this main impact will be filled by hand. The cost for the reinstatement has been met in the entirety by Circus Zyair. There are also some other areas on the Common that haven’t recovered from previous reinstatement as we would have hoped so a separate company will be coming onsite to vertidrain, surface dress and re-seed key areas. They will do this once the Funfair leaves site. Bensons Funfair will be arriving onsite on Monday.  They have re aligned their site plan to avoid those areas that have recently been instated and will also have track mats down along agreed vehicle routes.  A member of EventLambeth staff will be onsite to meet them when they arrive to ensure that these provisions are in...

Streatham Common Reinstatement Update

  We want to provide an update to local park users and residents about the reinstatement works on Streatham Common following Circus Zyair.   Lambeth Landscapes have been working on the area however the continued wet weather over the last month have impacted the speed of repairs as the ground has been too wet to work on.   Chain harrowing was carried out on Friday 13th April on the outer sections of the event area. Over the last few days the middle section of the event area has dried out considerably and the chain harrowing can now be carried out on it .   Over the coming week slitting will be undertaken to further level the area and break up uneven sections. Top dressing will take place across the event area along with seeding, and the damaged areas near the paths and gate will be filled in and top dressed.   The event area is temporarily taped off whilst works are carried out for health and safety reasons. It will be removed when works this have been completed in the coming week.   EventLambeth continue to monitor the site as well as liaise with Lambeth Landscapes around the work that has been undertaken. It should be noted that all groundwork is paid for by the event organisers....

Clapham Common Update

Due to continued wet weather the repair works on Clapham Common event site have been delayed. There are large areas of surface water and ground conditions have not been suitable to bring machinery on to continue with reinstatement.   Winterville organisers have brought in a Landscape contractor to assist Lambeth Landscapes and accelerate final repair works on the event site.   The contractors will arrive on site 12 April with machinery and will review the current ground conditions. Works will commence on 13th April, subject to weather, and carry on through the weekend into next week. The works will include harrowing, rolling, deep verti draining and over seeding. These work are scheduled to take 7 days.  The seed germination will begin within 7 to 10 days.   During this time the fence will remain around the event area to ensure safe working and protect the areas requiring the repair works. Following this there will be a phased fence removal based on advice from an agronomist and contractors.   EventLambeth continue to monitor the progress of repair works and will provide further updates over the coming week.   ...